Feasibility Study and Detailed  Designs for the Development of the  Millet Intake within the John Compton  Dam Raw Water Supply System

The Government of Saint Lucia (GOSL) obtained assistance from the World Bank (WB) towards the  financing of the Disaster Vulnerability Reduction Project (DVRP). The DVRP is aimed at reducing the  country’s vulnerability to natural hazards and climate change impacts such as more intense hurricanes  and storm events. This wider project is being implemented by the Department of Economic Development,  Transport and Civil Aviation through the Project Coordination Unit (PCU).    The Millet raw water intake and pipeline at Millet in Anse la Raye, in conjunction with the supply from the  John Compton Dam, is managed by the Water and Sewerage Company Incorporated (WASCO), and  contributes to the provision of potable water supply to the north of the island. This intake and pipeline  were severely damaged by Hurricane Tomas in 2010, and later by subsequent storm events. The Water  and Sewerage Company Incorporated which manages the island’s water supply has identified the  reconstruction of this Millet Intake as a priority and is the technical implementation agency responsible  for coordinating and managing this reconstruction project under the DVRP. The location of the Project  area is shown below in Figure 1 – Project Location Map.    As a precursor to the reconstruction, WASCO undertook a feasibility study which included a number of  studies, along with the preparation of detailed designs for the redevelopment of the Millet Intake. An  Environmental and Social impact assessment (ESIA) and Environmental and Social Management Plan  (ESMP) as part of this wider study along with a number of other inter‐related studies prepared under a  consultancy with by R.J. Burnside International Limited (Burnside).Â