Resources


 Showing page 1 of 1
Presentation on the Eastern Caribbean Central Bank 2010/2011 Annual Report :By Sir K Dwight Venner, Governor 29 June 2011
Filename: Dwight-Venner-ar2011speech.PDF | Size: 412.62 KB
Downloads: 3355
  

Resettlement Action Plan for the Construction of a Communal & Recreational Facility at Dennery Village
Filename: RESETTLEMENT-PLAN-DENNERY-VILLAG20110816105151.pdf | Size: 7.51 MB
Downloads: 5108
  

Resettlement Policy Framework, Hurricane Tomas Emergency Recovery Project
Filename: Resettlement-Policy-Framework-for-Hurricane-Tomas.pdf | Size: 452.19 KB
Downloads: 5247
  

Environmental & Social Safeguards Screening and Assessment Framework, Hurricane Tomas Emergency Recovery Project
Filename: Saint-Lucia-H--Tomas-Emergency-Recovery-Project---Draft-Environmental-and--Social-Safeguards-Assessment-Framework__AA.pdf | Size: 152.12 KB
Downloads: 3615
  

MILLET INTAKE FINAL GEOTECHNICAL REPORT | Performance Reports | 2020-10-01 07:52:39
R.J. Burnside engaged Amarna Consult Ltd to conduct a geological survey for the Millet Intake Project on behalf of the Water and Sewage Authority. This report deals with foundation parameters for proposed structures as well as geotechnical parameters for a proposed new pipeline and associated infrastructure. The purpose of the study was to confirm geological conditions and determine the geotechnical properties of the soil to inform the design of the proposed infrastructure. This report presents key design parameters and foundations options based on results from field exploration, laboratory testing and review of other relevant literature.
Filename: Millet-Intake-Geotechnical-Report-Update.pdf | Size: 2.11 MB
Downloads: 644