Publication of the Award of Contract - Micoud Secondary School


Category:     Award of Contracts
Public Reference:     SLU-DVRP-W-NCB-MSS-01-19
Financing:     The World Bank
Implementing Agency:     The Department of Economic Development, Transport and Civil Aviation
Permanent Secretary,
Department of Economic Development, Transport and Civil Aviation
1st Floor,
Finance Administrative Centre,
Pointe Seraphine,
Castries
Location:    Saint Lucia
Status:    Closed
Description:

PUBLICATION OF THE AWARD OF CONTRACT

 

 

Name of Project: Disaster Vulnerability Reduction Project

Procurement of Works- Micoud Secondary School

 

 

SLU-DVRP-W-NCB-MSS-01-19

 

a) Names of each Bidder who submitted a Bid

b) Bid Prices as read out at Bid Opening

 

Name of each Bidder who submitted a Bid

Bid Prices as Read Out at

Bid Opening XCD

OB Sadoo Engineering Services Ltd.

$6,162,004.45

Mega Contracting Inc.

$6,330,346.56

Contruction and Industrial Equipment Ltd.

$4,992,217.06

Cepal Holdings

$5,470,000.81

Qingdao Fuhaiyang Construction Group Co. Ltd.

$6,589,477.96

Triple "L" Company Ltd.

$6,416,300.63

Nanjing Xingye Construction Ltd

$3,623,345.00

 

 

c) Name and evaluated prices of each bid that was evaluated

 

Bidder

Evaluated Bid Prices - XCD

OB Sadoo Engineering Services Ltd.

 

$6,932,255.01

Mega Contracting Inc.

 

$7,121,639.88

Contruction and Industrial Equipment  Ltd.

 

$6,301,618.62

Cepal Holdings Inc.

 

$5,818,440.69

 

d) Names of bidders whose bids were either rejected as non responsive or not meeting the qualification criteria or non evaluation

 

Bidder

Reasons for Rejection  of Bid

Qingdao Fuhaiyang

Construction Group Co. Ltd.

 

•    Bid did not comply with ITB ll.l(a) and ITB ll.l(e)

Triple "L" Company Ltd.

•    The project referred to in the Letter of Bid is incorrect.

•    Bid did not comply with the requirements of ITB ll(a)

Nanjing Xingye Construction

•  Letter of Bid does not comply with ITB ll.l(a), ITB ll.l(e)

and ITB 12

• Supporting documents were note submitted to substantiate the Bidders qualifications as per ITB 17

 

e) Name of the winning bidder, and final total contract price, as well as the duration and summary scope of the contract.

 

Name: Cepal Holdings Inc.

Final Contract Price: XCD 5,818,440.69

Duration of Works: Fifteen (15) months

 

The works consist of:

 

  • Demolition of the existing reinforced concrete structure.
  • The Earthworks: Excavation and filling works including hard excavation.
  • Construction of a two-storey building on grade.
  • Concrete walk ways and storm water drainage works.
  • Electrical, plumbing, air-condition, gas, communications and fire fighting
  • Equipment installations
  • Fencing and landscaping works.

The site is located at Micoud,Saint Lucia and is defined in drawings No. A-100 -101

Debriefing

Any Bidder who wishes to ascertain the grounds on which its bid was not selected, should request an explanation from the Project Coordination Unit at the address indicated below.  A response in writing shall be provided explaining why such bid was not selected. If a bidder requests a debriefing meeting the bidder shall bear all the costs of attending such a debriefing meeting.

 

Attention:       The Project Coordinator

Project Coordination Unit

Disaster Vulnerability Reduction Project

Department of Economic Development, Transport and Civil Aviation

2nd Floor, Finance Administrative Centre, Point Seraphine,

Castries

Saint Lucia

Email: slupcu@gosl.gov.lc

Tel: 468 -2413